The subject of the contract was the assembly and erection of lattice poles of the 400 kV overhead power line between the Mikułowa power station and the Czarna power station.
The order included the assembly of the lattice column structure.
The total weight of the assembled structures equals 1,600 tons.
Completion date: 2020