Construction of a 2×400 kV line from Chełm – Lublin Systemowa

  • Lublin_Systemowa_2-662x883

The subject of the contract was the assembly and erection of lattice poles of a double-circuit 400 kV overhead line between the Chełm and Lublin Systemowa power stations.

The order included the assembly of the lattice column structure.

The total weight of the assembled construction stands equals 2,000 tons.

Completion date: 2020-2021

Comments are closed.